Piers for a corner where a ball rolls to the wall
Example project

- Home
- House in Renton with a hardwood-floored living room
- Original request
- A floor that seems to tilt: a ball set down rolls to the same corner
- Room
- Hardwood floor, a large window onto trees, a wooden chair
- Work outside
- Piers at the corner under that room, three or four of them
- Not included
- Floor refinishing and any engineer’s design
- Cost
- $8,400
Scope of work
Digging beside the foundation at the corner under the room, three or four steel piers set to the depth the plan calls for, backfill, and a check of the floor and window on that side. Floor refinishing, an engineer’s design and permit costs are not part of this cost.
Project overview
In this example, the owners of a house in Renton set a ball on the living room floor and watch it roll to the same corner every time. The room is bright, with a hardwood floor and a large window onto the trees.
Before anyone digs, the floor is measured from several points so the plan has numbers. The plan then puts three or four steel piers under the corner, and says where an engineer’s design or a permit applies.
The goal
The goal is a rolling floor measured before and after, with piers under the corner set to the depth in the plan.
Process
- Before work The floor is measured with a level at several points, and the plan, the permit question and the pier count are written.
- Dig The corner outside is dug out beside the footing and the soil is kept on boards.
- Piers The piers are set one at a time to the depth the plan shows.
- Check The strip is backfilled and the room is measured again.
Planning right
- Mark where the ball stops and tell us whether the tilt has changed over time.
- Move furniture away from the corner so the floor can be measured clean.
- Ask whether the window and the door on that side still open and close easily.
- Ask for the number of piers and the depth to be written in the scope.